Products Details
Vertical flowing ice making, full freezing power, fast cooling and powerful ice making. Suitable for fast food, milk tea, cold drinks, hotels and many other places.
European-style rounded design, luxurious and generous appearance.
With advanced intelligent control, water supply, ice making, dehydration and ice storage are automatically completed.
High-density insulation foam, no loss of cold capacity, good ice storage performance.
Adopt brand compressor with high efficiency and energy saving, reliable quality.
Product Parameters
Model |
Daily output kg/24h |
Ice storage capacity/ kg |
Power supply |
Cooling methods |
Power W |
Refrigerant |
Dimensions |
ID300 |
136 |
12 |
220v/50Hz |
Air-cooled |
750 |
R22 |
Mainframe:560*630*520 |
Water-cooed |
Ice storage560*830*1000 |
ID400 |
180 |
15 |
220v/50Hz |
Air-cooled |
1125 |
R22 |
Mainframe:560*630*620 |
Water-cooed |
Ice storage560*830*1000 |
ID500 |
227 |
15 |
220v/50Hz |
Air-cooled |
1300 |
R22 |
Mainframe:560*630*520 |
Water-cooed |
Ice storage560*830*1000 |
ID700 |
318 |
25 |
220v/50Hz |
Air-cooled |
1600 |
R22 |
Mainframe:760*640*770 |
Water-cooed |
Ice storage:760*830*1080 |
ID1000 |
455 |
25 |
220v/50Hz |
Air-cooled |
2100 |
R22 |
Mainframe:760*640*770 |
Water-cooed |
Ice storage:760*830*1080 |
ID2000 |
910 |
25 |
380v/50Hz |
Air-cooled |
3800 |
R22 |
Mainframe:1230*600*750 |
Water-cooed |
Ice storage:1230*940*1200 |
Installation Instructions
1. It is recommended to ask professional technicians with installation experience for installation or guidance.
2. The installation environment should be airy, pollution-free, dry indoor, avoid direct sunlight, no heat source around the ice machine, 200mm space distance from obstructions, use environment between 5ºC and 38ºC, water temperature below 30ºC.
3.The installation and use of the ice machine should be in accordance with the requirements of the use of international standards of drinking water, voltage requirements between 220v-240v, water pressure between 0.1-0,5Mpa, water quality is not good to install water treatment systems to avoid limescale to ensure that the ice machine normal ice production.
4. The water supply and drainage of the ice machine should be unobstructed, please refer to the instruction manual to connect the water supply and drainage.
Packaging & Shipping
Package Detail
1) Wooden packing
2) The goods can be shipped by sea, air or train, small goods or spare parts will be shipped by express.
3) You can choose your own freight forwardwe as well.
4) Door to Door Delivery to save your energy and time. We'll take the all risks during transportation.
Shipping Details
1) AMERICA:3-8 working days.
2) ASIAN:3-8 working days.
3) EUROPE:5-10 working days.
4) OCEANIA:4-9 working days.
5) AFRICA:7-13woring day.
Application Field
Company Profile
Xi'an Taikang Biotechnology Co., Ltd, is a famous manufacturer of Lab equipment located in the central China. Now has TAIKANG, TKA two well-known brand trademarks. The main products include ultra-high temperature and high pressure reactor, high pressure photochemical reactor, supercritical high pressure reactor, high pressure glass reactor, micro high pressure reactor, high pressure ultrasonic reactor, Ultra-high temperature hydrothermal synthesis reactor, photocatalytic reactor, visual catalytic reactor, hydrothermal synthesis reactor, rotary evaporator, parallel synthesis reactor, high and low temperature circulator, high and low temperature high pressure tubular reactor and other equipment and so on.
Specialize in this field for more than 20 years,TKA brand instrument has own high reputation in more than 70 countries and regions, provide technical support for tens of thousands organizations to solve problems within their research, special for university, research institutes, industries, inspection agencies, etc. Promoting technology progress and improving human life is TKA social mission.
Certifications
FAQ
Q1:Are you trading company or manufacturer?
A1:We are professional manufacture of lab equipment and we have our own factory which is a high-tech enterprise integrating R&D, production and sales. And welcome to visit our factory.
Q2: How long is your delivery time?
A2: Usually, delivery time is 30-45 days after receiving your payment.
Q3:How to shipping the replacement parts?
A3:We will according the actual situation to choose the suitable shipping ways. For small parts we shippin by Express.
Q4: How about your quality warranty ?
A4: Normally all TKA products are supplied with a warranty of 12 Months from the date of shipment.
Q5: Do you accept OEM and ODM orders?
A5: Yes,We accept.
Q6:What is your terms of payment?
A6:Payment≤15,000USD, 100% in advance. Payment≥15,000USD, 70% T/T in advance, balance before shipment.
(If you are concerned about payment security for the first order, we advise you can place Trade Assurance Order via Made in China. you will get 100% payment refund if we can't meet agreed delivery time.)
Q7:Can we visit your factory?
A7: Welcome visit our factory.