Mechanical magnetic double stirred High Pressured Reactor Autoclave
Suitable for photochemical high pressure reaction, carbon dioxide CO2 reduction, carbon dioxide CO2 reduction to methanol
Reduction of carbon dioxide CO2 to methane CH4, reduction and degradation of nitrogen oxides NOx, high-pressure photocatalytic degradation of formaldehyde
solution, etc. Photocatalytic reaction, Fischer-Tropsch reaction, hydrogenation reaction, polymerization reaction, homogeneous reaction and carbon dioxide supercritical reaction, etc. The product has obtained the national patent, patent number: 201003127547.0
Products Parameter
Material |
Stainless steel 316L/ Pure Titanium/Hastelloy (optional) |
Operating temperature |
250ºC/350ºC(optional) |
Operating voltage |
10MPa/20MPA(optional) |
Valve and conection material |
SU316L material |
Reactor liner container: |
teflo n inner sleeve easy to clean |
Transparent window material: |
Using polished JGS2 quartz glass (pressure window) or sapphire mirror |
Diameter Transparent window |
30mm-60mm (optional) |
Stirring speed |
0-1500RPM |
Revoving speed accuracy |
±5RPM |
Supply power |
220V,50HZ |
Stirring power |
25W-100W |
Heated power |
300W-1000W |
Thermal insulation layer |
Aluminum silicate cotton vacuum shaping environmental protection insulation body |
nsulating layer |
Alkali free glass fiber is used |
Working time |
Continuous work for 96 hours at a time |
Max pressure |
10Mpa |
Min pressure |
1Pa |
Valve fittings are European standard, interfaces are standard configuration. Ball valve can be connected with inert gas bottle, inert protection experimental reaction, reactants do not directly contact with the air. |
Package Detail
1) Wooden packing
2) The goods can be shipped by sea, air or train, small goods or spare parts will be shipped by express.
3) You can choose your own freight forwardwe as well.
4) Door to Door Delivery to save your energy and time. We'll take the all risks during transportation.
Shipping Details
1) AMERICA:3-8 working days.
2) ASIAN:3-8 working days.
3) EUROPE:5-10 working days.
4) OCEANIA:4-9 working days.
5) AFRICA:7-13woring day.
Xi'an Taikang Biotechnology Co., Ltd, is a famous manufacturer of Lab equipment located in the central China. Now has TAIKANG, TKA two well-known brand trademarks. The main products include ultra-high temperature and high pressure reactor, high pressure photochemical reactor, supercritical high pressure reactor, high pressure glass reactor, micro high pressure reactor, high pressure ultrasonic reactor, Ultra-high temperature hydrothermal synthesis reactor, photocatalytic reactor, visual catalytic reactor, hydrothermal synthesis reactor, rotary evaporator, parallel synthesis reactor, high and low temperature circulator, high and low temperature high pressure tubular reactor and other equipment and so on.
Specialize in this field for more than 20 years,TKA brand instrument has own high reputation in more than 70 countries and regions, provide technical support for tens of thousands organizations to solve problems within their research, special for university, research institutes, industries, inspection agencies, etc. Promoting technology progress and improving human life is TKA social mission.
We welcome new and old customers from all over the world to contact us for future business relationships and achieving mutual success!!
Q1:Are you trading company or manufacturer?
A1:We are professional manufacture of lab equipment and we have our own factory which is a high-tech enterprise integrating R&D, production and sales. And welcome to visit our factory.
Q2: How long is your delivery time?
A2: Usually, delivery time is 30-45 days after receiving your payment.
Q3:How to shipping the replacement parts?
A3:We will according the actual situation to choose the suitable shipping ways. For small parts we shippin by Express.
Q4: How about your quality warranty ?
A4: Normally all TKA products are supplied with a warranty of 12 Months from the date of shipment.
Q5: Do you accept OEM and ODM orders?
A5: Yes,We accept.
Q6:What is your terms of payment?
A6:Payment≤15,000USD, 100% in advance. Payment≥15,000USD, 70% T/T in advance, balance before shipment.
(If you are concerned about payment security for the first order, we advise you can place Trade Assurance Order via Made in China. you will get 100% payment refund if we can't meet agreed delivery time.)
Q7:Can we visit your factory?
A7: Welcome visit our factory.