TKA High-pressure Micro-reverse Catalytic Evaluation Device
Fixed bed reactors are widely used in various evaluations of catalysts and reaction process conditions under gas-solid phase or trickle flow conditions, including catalyst screening, composition screening and optimization of multi-component catalysts, reaction conditions and process optimization, catalyst life inspection, etc. The overall system of the fixed-bed reactor integrates automatic control, information processing and other technologies, and uses the pipeline of material research and development to greatly increase the scientific research capacity. It is more compact, more integrated, smarter and more expandable than the traditional single-tube reactor.
Basic Configuration Requirements
The device consists of a gas feed unit, a liquid phase feed unit, a reaction unit and a product separation and collection unit. The two paths of gas are metered by the mass flow controller and then enter the gas mixer for online mixing and then enter the reaction unit; one path of the liquid is metered by the metering pump and then mixed with the gas and then enters the reaction unit; the reactor adopts a fixed bed reactor, controlled by an isothermal heating furnace Reaction temperature; the product from the reaction unit enters the condenser for condensation, and then separates the gas and liquid phase by the gas-liquid separation tank. The liquid-phase product is discharged from the bottom of the gas-liquid separation tank, and the uncooled gas enters the back pressure valve to adjust the pressure and then empty.
|
Catalyst loading quantity |
10~20mL |
Temperature Range |
RT~800ºC |
Pressure Range |
0-20bar |
Gas Flow |
200~500mL/min |
Liquid Flow |
0.1~10mL/min |
Main Configuration List:
Reaction furnace: 1 set. The heating furnace adopts a three-stage isothermal electric heating furnace. The temperature of each furnace is independently controlled to ensure that the constant temperature section of the reaction zone is long enough and can achieve programmed temperature rise. The furnace insulation material adopts high temperature resistant and high density ceramic fiber material. Good thermal insulation effect. The outer shell is isolated by 304 stainless steel plate, so that the surface temperature of the reaction furnace is not hot, and the operation is safe;
Reactor: 1 set, the reactor adopts a high-pressure fixed-bed reactor, the feeding method is the lower end feeding and the upper end discharging, the reactor is designed with a quartz reaction tube, which is used for filling the catalyst, and the quartz reaction tube is easy to disassemble; the bottom of the reactor is designed with a A thermowell, a thermocouple that can move up and down is inserted into the sleeve to monitor the temperature of the catalyst bed, and the reactor is extruded and sealed with graphite/PTFE/FKM and other seals;
Gas-liquid mixer: 1 set, static mixing, material 316L;
Condenser: 1 set, spiral design, material 316L;
Gas-liquid separator: 1 set, volume: 200mL, material 316L;
Sampling tank: 1 set, volume: 20mL, material 316L;
Frame: 1 set, aluminum profile frame;
Pipe valve parts: 1 batch, material 316L;
Thermocouple: 1 batch;
Pressure transmitter: 1, range: 0~16MPa;
Mass flow controller: 2 sets, 0~500mL/min, accuracy: <=±1%F.S.; temperature drift: zero: < 0,05% FS/°C; repeatability: < 0,2% Rd; pressure sensitive Degree: 0,1%/bar typical N2; withstand pressure up to 10Mpa.
Delivery of technical data:
1 set of operation manual
1 set of certificate
1 set of warranty card
1 set of device general arrangement diagram and PID flow chart
Package Detail
1) Wooden packing.
2) The goods can be shipped by sea, air or train, small goods or spare parts will be shipped by express.
3) You can choose your own freight forwardwe as well.
4) Door to Door Delivery to save your energy and time. We'll take the all risks during transportation.
Shipping Details
1) AMERICA:3-8 working days.
2) ASIAN:3-8 working days.
3) EUROPE:5-10 working days.
4) OCEANIA:4-9 working days.
5) AFRICA:7-13woring day.
Xi'an Taikang Biotechnology Co., Ltd, is a famous manufacturer of Lab equipment located in the central China. Now has TAIKANG, TKA two well-known brand trademarks. The main products include ultra-high temperature and high pressure reactor, high pressure photochemical reactor, supercritical high pressure reactor, high pressure glass reactor, micro high pressure reactor, high pressure ultrasonic reactor, Ultra-high temperature hydrothermal synthesis reactor, photocatalytic reactor, visual catalytic reactor, hydrothermal synthesis reactor, rotary evaporator, parallel synthesis reactor, high and low temperature circulator, high and low temperature high pressure tubular reactor and other equipment and so on.
Specialize in this field for more than 20 years,TKA brand instrument has own high reputation in more than 70 countries and regions, provide technical support for tens of thousands organizations to solve problems within their research, special for university, research institutes, industries, inspection agencies, etc. Promoting technology progress and improving human life is TKA social mission.
Q1:Are you trading company or manufacturer?
A1:We are professional manufacture of lab equipment and we have our own factory which is a high-tech enterprise integrating R&D, production and sales. And welcome to visit our factory.
Q2: How long is your delivery time?
A2: Usually, delivery time is 30-45 days after receiving your payment.
Q3:How to shipping the replacement parts?
A3:We will according the actual situation to choose the suitable shipping ways. For small parts we shippin by Express.
Q4: How about your quality warranty ?
A4: Normally all TKA products are supplied with a warranty of 12 Months from the date of shipment.
Q5: Do you accept OEM and ODM orders?
A5: Yes,We accept.
Q6:What is your terms of payment?
A6:Payment≤15,000USD, 100% in advance. Payment≥15,000USD, 70% T/T in advance, balance before shipment.
(If you are concerned about payment security for the first order, we advise you can place Trade Assurance Order via Made in China. you will get 100% payment refund if we can't meet agreed delivery time.)
Q7:Can we visit your factory?
A7: Welcome visit our factory.